Construction Log
- Construction Notes - August 12, 2017
- Overview of Williamsport Industry extension. Brewery, Bicycle Factory, Hardware store?, Team track and coach yard.
-
- Operations Signage.
-
- Operations Signage, Dispatcher Information
-
- Operations Signage, Dispatcher desk.
-
- Operations Signage, Session Train Lineup
-
- Operations Signage, Road Crew.
-
- Notes
- The Williamsport extension is in operation. And I added more operator signage around the layout. There is station track layout, work instructions, timetable segments.
- Construction Notes - April 25, 2017
- Williamsport Industry. Track laid
-
- Michelle Cove mine extension.
-
- Michelle Cove mine extension behind James Crest switback.
-
- Michelle cove mine tipple location.
-
- Notes
- The Williamsport industry expansion track and switches were installed.
- I decided to remodel the James Crest/Michelle Cove area.
- Michelle Cove siding will now be a switchback into a mine. This will finally kill the idea of making the top of the corner as
an operating High Crust branch end. I decided that High Crust, when installed will be located in the utility room (behind the Stans Knob entrance.