New York and Eastern Rail Road







2022 through 2024 Construction Log

Construction Notes - November 11, 2022
Backdrop in place waiting for more upper level framework.
Backdrop in place
Another view of backdrop installation.
Backdrop in place
Construction Notes - September 4, 2022
Height difference between old level (left) and new level (right).
Height difference
End of benchwork by door.
End of benchwork by door
Benchwork over the door and Stans Knob.
Benchwork over the door
Construction Notes - August 13, 2022
Layout deconstruction over the yard module
Looking over the yard module
Layout deconstruction over the yard module towards Xina Pass.
Looking over the yard module towards Xina Pass
Layout deconstruction where Mine 1 was.
Looking where Mine 1 was
Layout deconstruction where Stans Knob and Xina Pass were.
Looking where Stans Knob and Xina Pass were
Layout deconstruction where the switchback was across the aisle from the yard
Looking where the switchback was across the aisle from the yard
Layout deconstruction where Becs Bend was
Looking where Becs Bend was
Notes
After December 2020 everything except the yard was dismantled saving the framework of the modules.
The modules were reassembled to provide the base framework that the foam modules would use.
Foam was roughly cut to sizes needed to provide a basic outline of the elevations and area for the modules.